Industrial
The GAC sewage treatment plant function is mainly of domestic nature as the ultimate average flow rate of waste water adds up to 7,875m3/day with a peak factor of 2.
The project is split into 2 phases that comprise a total of 6 trains and a total capacity of 7,875m3/day shown below:
Phase 1 Two (2) treatment trains with a capacity of 2,625m3 /day.
Phase 2 Four (4) treatment trains with a capacity of 5,250m3 /day.