MADINAH HAJJ CITY PACKAGE 1 –Chiller plant buildings

Industrial

MADINAH HAJJ CITY PACKAGE 1 –Chiller plant buildings


THERE ARE TWO CHILLER PLANT BUILDINGS ON THE SITE EACH WITH THEIR INDIVIDUAL TSE (TREATMENT SEWAGE EFFLUENT) TANKS LOCATED IN BASEMENT– 2. THESE CHILLER PLANTS PROVIDE AND MAINTAIN 24-HOUR UTILITY GENERATION, TRANSMISSION AND DISTRIBUTION TO ALL CAMPUS BUILDINGS. THE THERMAL ENERGY STORAGE (TES) TANKS FOR EACH CHILLER PLANT BUILDING ARE LOCATED IN CLOSE PROXIMITY TO THE CHILLERS PLANT AS SHOWN IN THE SITE LAYOUT. THE TOTAL CAPACITY OF TWO (2) CHILLER PLANT IS 200,000 TR.

Details


  • Location: ---
  • Owner: Industrial
  • Construction Cost: ---
  • Scope: ---